First Day of Integration
Hello all,
My name is Andreas Beyersdorf and I will be writing today's post. I am a graduate student at the University of California, Irvine and am working on the same project as Barry. Today was our first day of integration (installing our equipment on the Twin Otter). Because of the weight of the equipment we had to use a forklift to place the racks which will hold our equipment onto the plane. Fortunately, there were no accidents and we have installed 2 of the 4 racks.


<< Home